JUNE 1, 2020
RETAINING WALL
(behind Cliffview)
CONSTRUCTION NOTICE:
- A silt fence was installed on 5/12/20, which will not affect the residents.
- Construction will last about a month and a half.
- The crews will be operating from 7:30am-4:30pm, Mon-Fri and are hoping for minimal disturbance to the residents.
- Small equipment will be used.
- A construction road on common grounds on the side of 15485 Cliffview Drive will be built.
Please check back for updates.