JUNE 1, 2020

RETAINING WALL

(behind Cliffview)

 

CONSTRUCTION NOTICE:

  • A silt fence was installed on 5/12/20, which will not affect the residents.
  • Construction will last about a month and a half.
  • The crews will be operating from 7:30am-4:30pm, Mon-Fri and are hoping for minimal disturbance to the residents.
  • Small equipment will be used.
  • A construction road on common grounds on the side of 15485 Cliffview Drive will be built.

Please check back for updates.